Monte Cañón

Degraded

Galicia · Wind · 74 MW installed · 6 technicians · manager Kiarra Swaniawski

Output now

29.5 MW

Load factor

40 %

Energy today

659 MWh

Availability

96.9 %

Producing

12 / 16

Open alarms

4

Generation
Last 12 hours
Wind, solar and battery power at the point of interconnection. A charging battery shows below zero.
Conditions
Resource and grid

Wind

11.5 m/s WSW

Irradiance

0 W/m²

Temperature

15.6 °C

Cloud cover

56 %

Conditions

Partly cloudy

Substation

Mesón SE 220 kV

Voltage

219.6 kV

Frequency

49.986 Hz

Power factor

0.974

Curtailment

19 %

Day-ahead price

79.54 €/MWh

Assets

16 assets on site. Open one for its live 3D view.

Power flow

Wind turbine

WTG-01

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
92%

Output

5.68 MW

Today

46.6 MWh

Wind

13.2 m/s

Wind turbine

WTG-02

Siemens Gamesa SG 6.6-170 · 4.2 MW

Producing
16%

Output

0.65 MW

Today

46.2 MWh

Wind

7.4 m/s

Wind turbine

WTG-03

Nordex N149/4.0-4.5 · 6.2 MW

Producing
45%

Output

2.81 MW

Today

58.4 MWh

Wind

9.8 m/s

Wind turbine

WTG-04

Siemens Gamesa SG 5.0-145 · 5.0 MW

Producing
52%

Output

2.62 MW

Today

39.9 MWh

Wind

10.2 m/s

Wind turbine

WTG-05

Nordex N149/4.0-4.5 · 6.2 MW

Producing
86%

Output

5.32 MW

Today

52.1 MWh

Wind

11.8 m/s

Wind turbine

WTG-06

Vestas V162-6.2 · 5.0 MW

Producing
3%

Output

0.16 MW

Today

49.7 MWh

Wind

5.5 m/s

Wind turbine

WTG-07

Vestas V162-6.2 · 4.2 MW

Curtailed
22%

Output

0.92 MW

Today

20.0 MWh

Wind

9.7 m/s

Wind turbine

WTG-08

Nordex N149/4.0-4.5 · 6.2 MW

Producing
31%

Output

1.94 MW

Today

61.7 MWh

Wind

8.7 m/s

Wind turbine

WTG-09

Vestas V150-4.2 · 6.2 MW

Producing
3%

Output

0.16 MW

Today

59.0 MWh

Wind

5.2 m/s

Wind turbine

WTG-10

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
91%

Output

5.64 MW

Today

61.5 MWh

Wind

14.0 m/s

Wind turbine

WTG-11

Siemens Gamesa SG 6.6-170 · 5.0 MW

Producing
52%

Output

2.62 MW

Today

62.4 MWh

Wind

10.0 m/s

Wind turbine

WTG-12

Vestas V162-6.2 · 5.0 MW

Standby
0%

Output

0.00 MW

Today

47.1 MWh

Wind

9.0 m/s

Wind turbine

WTG-13

Siemens Gamesa SG 5.0-145 · 4.2 MW

Producing
18%

Output

0.75 MW

Today

29.4 MWh

Wind

7.8 m/s

Wind turbine

WTG-14

Vestas V150-4.2 · 4.2 MW

Curtailed
6%

Output

0.25 MW

Today

25.2 MWh

Wind

7.1 m/s

Inverter skid

INV-01

SMA Sunny Central 4600 UP · 5.0 MVA

Producing
5%

Output

0.23 MW

Today

43.1 MWh

Availability

99.6 %

Inverter skid

INV-02

Sungrow SG3125HV-MV · 5.0 MVA

Curtailed
42%

Output

2.08 MW

Today

20.7 MWh

Availability

94.2 %

Alarms
Site alarms
Most recent events from this site's assets.

Blade ice detected

WTG-02· 10-07 15:54
medium

IGBT temperature high

INV-02· 10-07 09:03
low

Pitch system hydraulic pressure low

WTG-05· 10-07 01:36
low

Yaw misalignment above limit

WTG-07· 10-06 21:18
low