GN-03
WorkingGenerator set · Caterpillar XQ230 (2025) · 8,564 h · Scroggie Creek
Last seen 19:52:38
Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Camp power
Unattended unit
Wash plant
—
Hours today
9.8 h
Cycle time
—
Cycles today
—
Engine hours
8,564 h
Next service
in 295 h
Telemetry
Live readings
Engine speed
1,801rpm
Coolant
90.8°C
Output
185kW
Voltage
602V
Frequency
60.04Hz
Fuel burn
33.7L/h
Fuel
Tank level
55%
697 L
In tank
33.7 L/h
Burn
20.6 h
Range
Utilisation
Hours on this shift
9.8 h
of a 12 h shift · 82% utilisation
Load
80%
Engine speed
1,714 rpm
Coolant
91 °C
Per hour
Utilisation and fuel burned today
Production day starts at 07:00.
Utilisation · %
Fuel · L
Alarms
Alarms (0)
No alarms on this unit in the last 48 hours.
Engine history
Engine speed, coolant and fuel level
Engine speed · rpm
Coolant · °C
Fuel level · %